Removing a Load-Bearing Wall During Renovation: Scope, Risks and Sequencing

An opening between the kitchen and living room can form part of a complete home renovation. If the wall is load-bearing, the change requires more than demolition and new finishes. Loads must be carried safely during and after the work. That calls for an assessment, a project-specific design and clear responsibilities between the engineer and contractor.

This article explains homeowner preparation for structural alterations during renovation. It is not a guide to removing a load-bearing wall yourself.

Establish the wall’s function before deciding the opening

Wall thickness, material and the direction of floor joists can suggest questions to investigate, but they do not prove whether a wall is structural. Previous alterations may also mean that the building differs from the drawings.

Have a structural engineer assess the actual situation, including the floors, roof, neighbouring structures and foundations where relevant. Discuss the desired opening and alternatives. A different layout may change the structural solution and the extent of the work.

Ask which information is established and which parts need further investigation. Do not treat a general internet rule as evidence that an uncertain structure is safe.

Check permissions for the full building project

The current Dutch framework includes the Besluit bouwwerken leefomgeving, or Bbl. IPLO uses removal of a load-bearing wall in an existing house as an example of a permit-required technical building activity because the load-bearing structure changes. See its guidance on technical building permits and notifications.

Assess the opening together with the rest of the proposal. A structural change that forms part of an extension meeting the conditions for technical permit-free building can be treated differently. IPLO’s explanation for associated buildings describes that distinction. Check the full project through the Omgevingsloket and clarify uncertainty with the municipality. Permit-free work must still meet the applicable safety rules.

For an apartment, establish which owners’ association agreements apply. Discuss shared building elements and potential effects on neighbours before the work is scheduled.

Keep the structural work within a coordinated plan

The engineer and contractor need to coordinate the permanent design, temporary situation and execution. Agree responsibility for temporary support, access, inspection points and changes. Beam dimensions, connections and supports belong to the design for this property, not a generic demolition sequence.

For the homeowner, the main stages are:

  1. Assessment and design: document the existing structure, assess the proposed opening and identify further investigations.
  2. Permissions and preparation: resolve applicable permissions and agreements, coordinate the work plan and identify outstanding information.
  3. Execution and checks: have the team work to the project-specific plan, with agreed inspections and assessment of deviations.
  4. Services and finishes: coordinate pipes, wiring, any required fire protection and the adjoining floors, walls and ceilings.
  5. Completion: review the agreed work and retain the relevant drawings, calculations and records.

Discuss risks before construction begins

A new opening can concentrate loads in different places. The assessment therefore needs to consider the support below, not just the opening itself. Ask whether foundation investigation is necessary and how adjoining buildings are taken into account.

Record the existing condition where relevant and agree how unexpected findings will be reported. New cracking or movement should not be dismissed as normal without assessment. Ask who makes the decision if the actual building differs from the design assumptions.

Existing services, material access, dust, noise and waste handling also need preparation. Have suspect materials assessed by a suitable specialist before they are disturbed. Check the cover and conditions for the renovation with your insurer rather than assuming that damage to neighbouring property is automatically covered.

Match the quotation to the rest of the renovation

A general price for removing a wall means little without an assessed design and defined scope. Ask for a breakdown covering investigation, structural work, access, services and finishes. Record what remains uncertain and how additional work will be agreed.

Coordinate the structural alteration with the kitchen, floor build-up, heating and wall finishes. Identify the checks needed before work is concealed. This helps keep important junctions and connections accessible for the agreed assessment.

Bring existing drawings, photographs and the intended layout to the first meeting. Ask who will handle the investigations, permission checks, execution plan and completion documents.

Discuss the full renovation

Vlas Construction includes structural alterations within substantial renovation projects in The Hague and surrounding areas. Read about our approach to complete home renovation, or share your plans and request a free quote.

Ready to get started?

Get in touch about your renovation project

Contact us
Best Build Order for Insulation, New Glazing, Heating and Finishes
Whole-House Renovation Budgeting in 2026: Where to Spend First
Sloopmelding and Demolition Planning for Major Residential Renovations